Manual Install !exclusive! - Drgem X Ray Service
Incorrect wiring can destroy the high-voltage generator or digital flat panel detectors. Turn off all main power sources before making connections.
After installation, you must perform a comprehensive QA check to ensure safety.
Press all emergency stop buttons on the console, table, and tube stand to verify immediate power cut-off.
Install a dedicated molded case circuit breaker (MCCB) near the operator console. Structural and Radiation Safety drgem x ray service manual install
Connect a calibrated non-invasive X-ray multimeter to measure output accuracy. Enter the generator’s service mode via the calibration software to adjust the filament curves and high-voltage inverter gain settings. 6. Final Inspection and Handover
Test all mechanical safety locks and emergency stop buttons.
Maintenance and safety are paramount. DRGEM systems incorporate features to support them: Incorrect wiring can destroy the high-voltage generator or
Anchor the floor rail securely using expansion bolts. Ensure it is perfectly level using a spirit level. Mount the vertical column onto the rail carriage.
Less than 10 ohms. A dedicated ground wire is mandatory to eliminate electrical noise on image receptors. Structural Requirements
: The DRGEM GXR-S Series offers flexible configurations, including: Press all emergency stop buttons on the console,
: Mount the vertical wall stand, verifying it is perfectly perpendicular to the floor and aligned with the X-ray tube travel path. 3. Electrical Connections and Cabling
For ceiling-suspended systems, securely anchor the overhead rails to the structural unistrut ceiling grid. Verify true vertical alignment using a plumb line.