Leica Tcr805 Total Station User Manual -
Use the three to level the electronic plate level shown on the display.
Turn the instrument until the display faces parallel to two of the tribrach footscrews.
Rotate the instrument 90 degrees to check levelness in all directions. 🖥️ Navigating the Menu and Interface leica tcr805 total station user manual
Aim the crosshairs precisely at the center of your backsight target.
Align the display parallel to two of the tribrach footscrews. Use the three to level the electronic plate
Once field operations are complete, data must be transferred to a computer for processing in CAD or GIS software. Connecting to a PC
Up to 3,000 meters using a single standard round prism. 🖥️ Navigating the Menu and Interface Aim the
Understanding the core capabilities of your Leica TCR805 ensures you deploy it correctly on the job site. Key Performance Specifications 5 arc-seconds (5"). Display Resolution: 1" (0.1 mgon).
Accurate data begins with a flawless physical setup. Follow these steps to eliminate center and leveling errors. Step 1: Tripod Setup Extend the tripod legs to a comfortable working height.
If you need help with a specific workflow, let me know you are trying to run or what error code you are encountering, and I can give you the exact button-push sequence to resolve it. Share public link
Environmental changes or bumpy transport can knock the optical components out of alignment. You can easily fix horizontal and vertical collimation errors in the field: