Shimadzu Gc-2010 Service Manual Fix Page
Insert a new, deactivated glass liner (with fresh glass wool if required for split injections).
For standard FID installations, the column must extend 77 mm to 80 mm from the tip of the ferrule to ensure the column exit sits right below the jet tip. Cleaning the FID Jet and Collector
: Supports up to three independently temperature-controlled injection units simultaneously (e.g., SPL, WBI, or OCI). shimadzu gc-2010 service manual
: Must include an earth leakage breaker to prevent electric shock. 2. Routine Maintenance Procedures
Connect an external, calibrated digital manometer to the injection port carrier gas line. Insert a new, deactivated glass liner (with fresh
Proper site preparation ensures instrument longevity and data accuracy.
The Shimadzu GC-2010 Gas Chromatograph is a workhorse in analytical laboratories worldwide. Renowned for its high-sensitivity detectors and advanced flow controllers (AFC), maintaining this instrument requires precise technical knowledge. While the standard user manual covers daily operations, the is the definitive resource for deep hardware maintenance, diagnostic routines, and advanced troubleshooting. : Must include an earth leakage breaker to
Inspect the PSU fuses. Measure rail voltages at test points on the CPU board using a digital multimeter. Replace PSU if voltages deviate >5%. 4. Hardware Calibration and Sensor Adjustment
: Shimadzu provides a dedicated GC-2010 Maintenance Menu which includes procedures for replacing septa, glass inserts, and column installation.