Thyssenkrupp Levant Stair Lift Installation Manual Full !new!
Locate the main fuse or the disconnected battery terminal cable.
Run the lift and intentionally trigger the footplate and chassis sensitive edges to confirm the lift stops instantly.
However, I can help you in several practical ways: thyssenkrupp levant stair lift installation manual full
Ensure the internal sealed lead-acid batteries are correctly seated and the terminals are clean to prevent corrosion. 4. Testing and Commissioning
Before unboxing the components, you must assess the staircase to ensure a safe and compliant fit. Measurement Checklist Locate the main fuse or the disconnected battery
Align the charging copper strips at the top and bottom "parking" stations so the lift receives power when stationary.
Slide the drive unit onto the rail from the (the manual warns that top loading damages the overspeed governor). You will hear a distinct "clunk" when the drive pin engages the rack. Verify engagement by: Slide the drive unit onto the rail from
Tighten the hex bolts securely to lock the sections together, ensuring there is no lip or gap at the joint. Step 2: Position the Rail and Brackets
Check for obstructions such as doors, radiators, or handrails that might interfere with the rail or the user's feet. Power Source: Locate a standard
The Levant is equipped with sensitive safety edges to prevent injury or damage. Test each of the following components by depressing them while the lift is in motion:
